How Long Does a Kitchen Renovation Take?
A standard kitchen renovation in Bolton or Manchester typically takes 5–10 working days. Here is a realistic breakdown of the stages and what affects the timescale.
How long a kitchen renovation takes is one of the most practical questions homeowners ask — and the answer depends on the scope of the work, whether the layout is changing, and whether any unexpected issues arise once the old kitchen is removed.
A straightforward kitchen replacement — removing the old units, fitting new ones in the same positions, and updating the worktops, splashback and flooring — typically takes 5–7 working days for a medium-sized kitchen. This assumes all materials are on site before work begins and no plumbing or electrical points are being moved.
A more complex renovation — changing the layout, moving the sink or hob, adding an island, or carrying out significant electrical work — will take longer. A full layout change with new plumbing and electrical circuits typically adds 3–5 days to the programme.
The typical programme for a standard kitchen renovation runs as follows. Day 1: strip out the old kitchen, protect floors and adjacent rooms. Day 2: first fix plumbing and electrics — moving or extending any services. Day 3–4: fit the carcasses and appliances. Day 5: fit the worktops and splashback. Day 6: second fix plumbing and electrics, fit doors and handles. Day 7: tiling, flooring and snagging.
One factor that frequently extends kitchen timescales is worktop templating and fabrication. Quartz and granite worktops are templated after the carcasses are fitted and then fabricated off-site — this typically takes 5–7 working days. During this period, the kitchen can be used with temporary worktops or the programme can be structured so other work fills the gap.
IK Master Build Ltd will give you a realistic programme before work starts so you know exactly what to expect and can plan accordingly. Call 07402 059 555 to discuss your kitchen project.